Home Account Search
Storm Water Sediment Separators Rt.9 at the Bridge

2/18/09– NYSDOT is currently reviewing plans for placement of two (2) Vortech separators along side of Rt .9.The Initial Plan Proposal has been signed and approved, the next step is final design.  One separator will be located at the end of Liss Road (Fisherman’s Park) and Rt. 9 on the southern end of the Rt. 9 Bridge. The other will be located north of the Rt. 9 Bridge  on the eastern side just below the turn around. These units which will be maintained by NYSDOT will separate storm water sediment from Rt. 9 North and South as it flows towards the Bridge. The tentative plan is to place these units is Spring 2009. For an up to date status you may contact me John M. Karge, MS-4 Storm Water Coordinator at the Village Hall 845-297-8773 or E-Mail jmkarge@optonline.net.